ProofCycle
by SVCM
Certificate of Disposition
COD-2026-00418
Customer
Apex Robotics Lab
James Chen
Facility
SVCM Fremont
Method
Shred + recovery
Industrial shredding with material recovery and sorting
Certifier
M. Santos
Ops Lead
Date destroyed
May 22, 2026
Weight
184.6 lb total
38.1 lb recovered
Verifier URL
verify.proofcycle.com/COD-2026-00418
SHA-256 hash
8f4c9d27a1e8b0f6aa93e1c04d88c17db93a9f2e7b1d3c5a8f4e6d0b9c2a1f3e
signature: valid · publicKeyId: svcm-key-001
Item manifest
| Description | Material | Qty | Weight | Disposition |
|---|---|---|---|---|
| Actuator prototype v3 | Aluminum + electronics | 18 | 124.2 lb | destroyed |
| CNC fixture rejects | 6061-T6 aluminum | 7 | 38.1 lb | recovered |
| Sensor housings | Mixed metal | 42 | 22.3 lb | destroyed |